
Intel PipeRack (T17 and T18)
- Client
- Sami Najami Engineering & Projects
- Weight
- 516 tons
Pipe-rack structural modeling and detailing.
Home / Projects
18 projects for clients in the United States, Italy, the Netherlands, Brazil, Saudi Arabia, Australia, Lebanon, Egypt and Kuwait: steel structures, plant piping and stress analysis.

Pipe-rack structural modeling and detailing.

Structural modeling and coordination.


Automated rack building structural modeling.

220 kV switching station. Substation steelwork modeling and structural coordination.

220 kV switching station. Substation steelwork modeling and structural coordination.

Pipe-rack structural modeling and detailing.


Industrial steel structure modeling and detailing.

Steel building structural modeling and detailing.

Industrial building structural modeling.

Steel support structure modeling for street lighting.

Office and warehouse structural modeling.


Design and modeling of a boiler package with deaerator and six feed-water pumps. Deliverables: 3D modeling, fabrication drawings, BOM, piping works and steel structure.

Pump-station piping stress-analysis report, 3D modeling, piping isometrics, plot plan, MRQ and tank-nozzle orientation.

Utility-area plant piping and pumping-system design to ASME B31.3: 3D modeling, isometrics, BOM, pipe specifications, line and equipment lists, standard pipe-support drawings.

Water-treatment-plant piping and pumping-system design to ASME B31.3: 3D modeling and initial MTO.

3D modeling of the water-treatment and distillation room.


Pump-station piping and tank stress-analysis reports in Caesar II, with support, anchor, nozzle and foundation load references.


Horizontal chilled- and hot-water stress analysis, and piping stress analysis and supports for about 24 risers, in Caesar II.
Send the drawings, specifications or a short description of the scope. We come back with an approach, a schedule and our first questions.